Seen from the beach at Ada Ciganlija, the Ada Bridge looks less like a road than an instrument: a single white needle 200 metres tall, with eighty cables fanned out from it like the strings of a harp nobody is quite tall enough to play. It is the most photographed piece of engineering in Belgrade, and one of the cleverest.
The competition
At the end of 2004 the Slovenian bridge designers Ponting, led by Viktor Markelj and Peter Gabrijelčič, won the competition for a new crossing of the Sava at the tip of Ada Ciganlija. Their idea was a composite cable-stayed bridge with one pylon, standing not in the river but on the island itself, so that the Sava below stayed clear for shipping.
The contract to build it went to a joint venture of Austria’s Porr, Slovenia’s SCT and Germany’s DSD, with the structural design worked up by the German engineers Leonhardt, Andrä und Partner and Ponting checking every calculation as independent engineer. Main works began in December 2008.
A needle on a ring of piles
The pylon is a cone, circular in section, split at its base so that trams can pass straight through its feet. It stands on a circular diaphragm wall with 113 bored piles driven into the island’s sands.
The cone that was meant to crown its tip was never fitted: a helicopter attempt in May 2012 was called off because of the wind. Belgrade has never seemed to miss it.
Steel over the river, concrete on land
The 376-metre main span over the Sava is steel: a three-cell box girder with an orthotropic deck, about 8,600 tonnes of it. On the other side of the pylon a 200-metre back span of post-tensioned concrete acts as the counterweight, so that the two halves balance across the mast like a set of scales. The whole bridge is 964 metres long.
The deck is 45 metres wide and four and a half metres deep, carrying three traffic lanes and a tram track in each direction, with paths for walkers and cyclists along both edges. The eighty stays are arranged in a semi-fan, use about 1,280 tonnes of high-strength steel and hold up to 91 strands each; the longest is about 373 metres.
Closing the gap
The steel was built out over the river as a cantilever, segment by segment, and the approach viaduct was pushed out by incremental launching. On 8 August 2011 the final steel segment went in and the two banks were joined. The bridge opened at midnight on 1 January 2012, and trams began crossing on 4 July 2019.
In 2012 the engineers collected three professional awards, among them the Chamber of Engineers of Serbia’s CES Award, shared by Viktor Markelj of Ponting and Martin Steinkühler of Porr. The Discovery Channel’s Build It Bigger devoted a whole episode to the construction.
Two great Sava bridges
Stand on the right bank of the Sava and you can see the Ada Bridge and, downstream, the New Railway Bridge of 1979, by Nikola Hajdin and Ljubomir Jevtović: the first cable-stayed bridge in the world built solely for trains. Hajdin, by then the grand old man of Serbian bridges, chaired the jury that chose the Ada design. One city, two generations of cable-stayed bridge, within sight of each other.
See it for yourself
The best views are from the water’s edge at the tip of Ada Ciganlija, from the Sava quay in New Belgrade, and from the river on a boat trip. Cross on foot or by bike at dusk, when the pylon is lit, and look up: from directly below, the cables close over your head like the ribs of a tent.